Illustrative manufacturing facilities scene

ALKA · AUSTRALIAN COATINGS MANUFACTURER

Manufacturing Facilities

Coordinated protection across production and service areas.

SERVICE & APPLICATIONS

Protection matched to the asset.

Production facilities combine steel frames, equipment supports, concrete floors and occasional containment areas. ALKA offers separate protective and flooring system routes so each surface can be selected for its operating conditions without forcing one coating across the entire facility.

Plant steel

Frames, machinery supports and service structures need protection matched to internal or external exposure.

Wet and washdown areas

Record cleaning liquids, wetting frequency and substrate condition when specifying a barrier system.

Production floors

Select concrete flooring for traffic, moisture, impact, cleaning and slip requirements through the dedicated flooring library.

ALKYD PRIMERS · ENAMELS · SINGLE-PACK FINISHING

Everyday finishing alongside engineered protection

Manufacturing sites need both production finishes and specialist protection. Single-pack alkyd primers and enamels can suit fabricated parts, machinery covers, racks, cabinets and dry service steel, while process areas, washdown zones and production floors require separate selection.

Products to assess for the job

Select a complete, compatible primer and finish. The products above are options by role, not a blanket approval to combine every primer and topcoat.

What the applicator or specifier needs

01 · Define the component and duty

Create a component schedule with substrate, indoor/outdoor location, cleaning regime, appearance and handling requirements. Include fabrication and assembly stages.

02 · Prepare and prove compatibility

Standardise cleaning and preparation for each substrate. Confirm compatibility with shop primers and retained coatings; use a representative trial where repainting is involved.

03 · Plan handling and return to service

Agree the finish sample, recoat and handling window and inspection records before batch work. Check coverage on edges and recessed areas as well as the visible face.

Write a usable coating schedule

Specify the substrate and preparation, exact primer and finish, individual-coat dry-film thickness, application method, thinning limits, recoat interval and service-cure requirement from current product data. For repainting, document the retained coating and a representative compatibility trial before full application.

Choose the coating for the exposure

Chemical containment, aggressive washdown, ESD requirements and traffic-bearing floors need dedicated systems and evidence for the required service.

A single-pack route can simplify small batches and routine repainting because it does not require mixing a separate hardener. It still depends on sound preparation, suitable film build and the correct recoat window. Where exposure or the required maintenance interval is more demanding, assess the relevant two-pack epoxy, polyurethane or specialist lining system.

Does fast drying mean the part is ready for service?

No. Touch-dry, recoatable, handleable and fully cured describe different stages. Use the selected product data and actual application conditions to plan each stage. Excessive film build, early overcoating or premature handling can compromise the finish; adding extra thinner or a hardener is not a substitute for the specified application procedure.

SELECT THE COMPLETE BUILD

ALKA systems for this application.

SystemWhy select itCoating buildTotal DFT
ALKA-9931
General Industrial
Balanced protection, appearance and cost without requiring a zinc-rich primer

Prepared steel; moderate internal or external industrial atmospheric exposure

Alka 416 single-pack epoxy coating → Alka 413 high-build epoxy → Alka 421 polyurethane finish225–275 µm
ALKA-9940
Economical Maintenance
Cost-effective protection for routine maintenance where exposure is not severe

Prepared steel in mild to moderate industrial atmospheric conditions

Alka 416 single-pack epoxy coating → Alka 412 or Alka 413 maintenance epoxy200–250 µm
ALKA-9935
Glass-Flake Barrier Lining
High-build glass-flake barrier delivers strong resistance to permeation, wet service and abrasion

Prepared steel or concrete exposed to wet service, abrasion, splash, spillage or aggressive industrial conditions

Substrate-specific primer where required → Alka 414 Glass Flake Epoxy → optional approved build or finish coat400–750 µm

DFT = dry-film thickness. These are nominal system totals; individual-coat thicknesses and application conditions belong in the final coating schedule.

SPECIFICATION & APPLICATION

From surface preparation to return to service.

Build the coating schedule around the substrate and the work that can be achieved on site. For refurbishment, assess the adhesion and compatibility of retained coatings before defining repair boundaries.

  • 01Production zones and substrates
  • 02Cleaning and spillage
  • 03Traffic and impact
  • 04Shutdown and ventilation requirements

Record surface preparation, environmental conditions, coverage at details and coat thickness. Allow for the specified recoat and cure periods, then inspect and repair defects before release to service.

ALKA-9935 · Barrier-lining example

ALKA 414 glass-flake epoxyHigh-build barrier layer
Substrate-specific primer where requiredSelected for steel or concrete and service conditions
Prepared substrateSound steel or concrete, with defects and interfaces addressed

Schematic, not to scale. Follow the selected system for products, layer count and thickness.

TECHNICAL QUESTIONS

Details that affect system selection.

Can one epoxy cover the steel and the floor?

A common resin type does not make the systems interchangeable. Steel primers, floor preparation, traffic resistance, film build and finish requirements differ. Specify each substrate and function separately.

What belongs in the final technical submission?

Include current TDS and SDS, substrate preparation, the product and thickness schedule, application conditions, inspection criteria and cure requirements. For chemical or immersed service, include written suitability for the actual exposure. Any required certification or durability commitment must be supported by the relevant evidence.

Application boundaries

Food contact, electrical resistance, controlled environments and process containment are distinct requirements. They need relevant evidence for the selected system and exact use.

CONCRETE FLOORING

Select the floor as a complete system.

Separate floor performance from steelwork protection. Compare ALKA flooring builds for traffic, moisture, chemical exposure, cleaning and the required finish.

Explore flooring systems

PRODUCTS & TECHNICAL DOCUMENTS

Go directly to the product information.

Read the published technical data sheets below, or open a product overview. Request the current SDS set and confirm the document revisions for your specification before procurement.

MANUFACTURER TECHNICAL SUPPORT

Turn the service conditions into a coating specification.

Send the asset, substrate, exposure and maintenance window. ALKA can help define the coating build, preparation and technical documentation for your review.

Discuss your specification

Use current product data and the agreed project specification. Industry imagery is illustrative and does not represent a completed ALKA project.