Illustrative tank farms & terminals scene

ALKA · AUSTRALIAN COATINGS MANUFACTURER

Tank Farms & Terminals

A coating schedule for tanks, transfer areas and supporting steel.

SERVICE & APPLICATIONS

Protection matched to the asset.

Terminal coating decisions extend from exposed tank shells to internal linings and containment. ALKA systems help separate these duties while supporting practical maintenance planning around storage operations and access.

Tank exteriors

Shells, roofs, stairs and pipe supports need atmospheric corrosion protection and a suitable finish.

Storage and transfer

Internal tank linings and loading-area containment follow the specific stored product and contact conditions.

Maintenance planning

Survey coating condition and define preparation, repair boundaries and the full cure window before returning assets to service.

ALKYD PRIMERS · ENAMELS · SINGLE-PACK FINISHING

Coordinate exterior colours and practical maintenance

Selected access items, equipment housings, workshop-finished parts and suitable tank exteriors in mild atmospheric service can be considered for single-pack primer/enamel finishes. Fuel-transfer, spill and containment surfaces need distinct specifications even when they share the same asset colour.

Products to assess for the job

Select a complete, compatible primer and finish. The products above are options by role, not a blanket approval to combine every primer and topcoat.

What the applicator or specifier needs

01 · Define the component and duty

Separate atmospheric exteriors, bunds, transfer points, tank bases and internal linings in the asset schedule. Record the fluids and temperatures involved.

02 · Prepare and prove compatibility

Assess contamination and existing paint before planning local repair. Pay particular attention to seams, bolted details and areas that retain water.

03 · Plan handling and return to service

Agree identification colours, access for future inspection and the coating repair procedure. Keep lining cure and release requirements separate from exterior finishing.

Write a usable coating schedule

Specify the substrate and preparation, exact primer and finish, individual-coat dry-film thickness, application method, thinning limits, recoat interval and service-cure requirement from current product data. For repainting, document the retained coating and a representative compatibility trial before full application.

Choose the coating for the exposure

Fuel contact, tank interiors, chemical bunds and persistent wetting need an approved system for that service.

A single-pack route can simplify small batches and routine repainting because it does not require mixing a separate hardener. It still depends on sound preparation, suitable film build and the correct recoat window. Where exposure or the required maintenance interval is more demanding, assess the relevant two-pack epoxy, polyurethane or specialist lining system.

Does fast drying mean the part is ready for service?

No. Touch-dry, recoatable, handleable and fully cured describe different stages. Use the selected product data and actual application conditions to plan each stage. Excessive film build, early overcoating or premature handling can compromise the finish; adding extra thinner or a hardener is not a substitute for the specified application procedure.

SELECT THE COMPLETE BUILD

ALKA systems for this application.

SystemWhy select itCoating buildTotal DFT
ALKA-9930
Premium External
Premium corrosion protection combined with a UV-stable, colour-retentive finish

Abrasive-blasted carbon steel; external industrial and coastal atmospheric exposure

Alka 404 zinc-rich epoxy primer → Alka 413 high-build epoxy → Alka 421 polyurethane finish250–300 µm
ALKA-9937
Severe Maintenance
Combines surface tolerance, high build and glass-flake barrier performance for demanding maintenance work

Prepared steel, galvanised steel, aluminium or stainless steel in difficult maintenance environments, subject to technical approval

Alka 418 MIO glass-flake surface-tolerant epoxy; one or two coats as specifiedNominal 250–600 µm depending on coat schedule
ALKA-9936
Chemical-Resistant Lining
Higher chemical resistance than standard epoxy systems for demanding process environments

Prepared steel or concrete in tanks, bunds, process areas and secondary containment

Alka Tanklin 100 and/or Alka Tanklin Chem system selected to suit the chemical service450–600 µm

DFT = dry-film thickness. These are nominal system totals; individual-coat thicknesses and application conditions belong in the final coating schedule.

SPECIFICATION & APPLICATION

From surface preparation to return to service.

Build the coating schedule around the substrate and the work that can be achieved on site. For refurbishment, assess the adhesion and compatibility of retained coatings before defining repair boundaries.

  • 01Stored product and service changes
  • 02Liquid and vapour exposure
  • 03Existing lining condition
  • 04Outage and filling requirements

Record surface preparation, environmental conditions, coverage at details and coat thickness. Allow for the specified recoat and cure periods, then inspect and repair defects before release to service.

ALKA-9930 · External steel example

ALKA 421 polyurethane finishExternal colour and finish retention
ALKA 413 high-build epoxyIntermediate barrier protection
ALKA 404 zinc-rich epoxy primerCorrosion protection on prepared steel
Prepared carbon steelClean, profiled substrate and treated details

Schematic, not to scale. Follow the selected system for products, layer count and thickness.

TECHNICAL QUESTIONS

Details that affect system selection.

Can the same lining be used when a tank changes service?

A change in contents, temperature or cleaning can change compatibility. Review the existing lining condition and new exposure before approving continued use or specifying a replacement.

What belongs in the final technical submission?

Include current TDS and SDS, substrate preparation, the product and thickness schedule, application conditions, inspection criteria and cure requirements. For chemical or immersed service, include written suitability for the actual exposure. Any required certification or durability commitment must be supported by the relevant evidence.

Application boundaries

Tank integrity, hazardous-area controls and terminal operating procedures remain part of the wider asset design. Lining compatibility and any fuel-quality requirements must be addressed for the actual stored material.

PRODUCTS & TECHNICAL DOCUMENTS

Go directly to the product information.

Read the published technical data sheets below, or open a product overview. Request the current SDS set and confirm the document revisions for your specification before procurement.

MANUFACTURER TECHNICAL SUPPORT

Turn the service conditions into a coating specification.

Send the asset, substrate, exposure and maintenance window. ALKA can help define the coating build, preparation and technical documentation for your review.

Discuss your specification

Use current product data and the agreed project specification. Industry imagery is illustrative and does not represent a completed ALKA project.