Illustrative mineral processing plants scene

ALKA · AUSTRALIAN COATINGS MANUFACTURER

Mineral Processing Plants

A coordinated coating approach for process steel and wet areas.

SERVICE & APPLICATIONS

Protection matched to the asset.

Mineral processing plants bring atmospheric corrosion, washdown and reagent exposure into close proximity. ALKA systems allow structural steel, maintenance repairs and chemical containment to be specified as distinct duties within one plant coating schedule.

Process structures

Platforms, pipe racks and equipment supports need weather protection, detail coverage and a practical inspection plan.

Washdown areas

Repeated wetting and cleaning make substrate condition, drainage interfaces and barrier continuity important.

Reagent containment

Select the lining around the chemical identity, concentration, temperature and expected contact period.

ALKYD PRIMERS · ENAMELS · SINGLE-PACK FINISHING

Match everyday plant finishes to the process zone

Dry service frames, equipment covers and workshop-finished components may suit single-pack protective primers and enamels. Plant areas exposed to washdown, slurry, reagents or repeated spillage need their own coating route; a visually similar steel surface can have a very different service requirement.

Products to assess for the job

Select a complete, compatible primer and finish. The products above are options by role, not a blanket approval to combine every primer and topcoat.

What the applicator or specifier needs

01 · Define the component and duty

List the cleaning products, process liquids, wetting frequency and operating temperatures for each zone. Include maintenance activities as well as normal production.

02 · Prepare and prove compatibility

Remove process deposits and oil before preparing the surface. Assess adhesion of retained coatings and confirm primer/topcoat compatibility on a representative repair area.

03 · Plan handling and return to service

Plan isolation, ventilation and cure around production restart. Confirm the coating is ready for cleaning or chemical exposure before returning the asset to that duty.

Write a usable coating schedule

Specify the substrate and preparation, exact primer and finish, individual-coat dry-film thickness, application method, thinning limits, recoat interval and service-cure requirement from current product data. For repainting, document the retained coating and a representative compatibility trial before full application.

Choose the coating for the exposure

Persistent washdown, chemical spillage, wet/dry cycling and immersed service require a separately selected protective or lining system.

A single-pack route can simplify small batches and routine repainting because it does not require mixing a separate hardener. It still depends on sound preparation, suitable film build and the correct recoat window. Where exposure or the required maintenance interval is more demanding, assess the relevant two-pack epoxy, polyurethane or specialist lining system.

Does fast drying mean the part is ready for service?

No. Touch-dry, recoatable, handleable and fully cured describe different stages. Use the selected product data and actual application conditions to plan each stage. Excessive film build, early overcoating or premature handling can compromise the finish; adding extra thinner or a hardener is not a substitute for the specified application procedure.

SELECT THE COMPLETE BUILD

ALKA systems for this application.

SystemWhy select itCoating buildTotal DFT
ALKA-9930
Premium External
Premium corrosion protection combined with a UV-stable, colour-retentive finish

Abrasive-blasted carbon steel; external industrial and coastal atmospheric exposure

Alka 404 zinc-rich epoxy primer → Alka 413 high-build epoxy → Alka 421 polyurethane finish250–300 µm
ALKA-9935
Glass-Flake Barrier Lining
High-build glass-flake barrier delivers strong resistance to permeation, wet service and abrasion

Prepared steel or concrete exposed to wet service, abrasion, splash, spillage or aggressive industrial conditions

Substrate-specific primer where required → Alka 414 Glass Flake Epoxy → optional approved build or finish coat400–750 µm
ALKA-9936
Chemical-Resistant Lining
Higher chemical resistance than standard epoxy systems for demanding process environments

Prepared steel or concrete in tanks, bunds, process areas and secondary containment

Alka Tanklin 100 and/or Alka Tanklin Chem system selected to suit the chemical service450–600 µm

DFT = dry-film thickness. These are nominal system totals; individual-coat thicknesses and application conditions belong in the final coating schedule.

SPECIFICATION & APPLICATION

From surface preparation to return to service.

Build the coating schedule around the substrate and the work that can be achieved on site. For refurbishment, assess the adhesion and compatibility of retained coatings before defining repair boundaries.

  • 01Process and cleaning chemicals
  • 02Steel or concrete substrate
  • 03Wetting and immersion regime
  • 04Shutdown and commissioning window

Record surface preparation, environmental conditions, coverage at details and coat thickness. Allow for the specified recoat and cure periods, then inspect and repair defects before release to service.

ALKA-9930 · External steel example

ALKA 421 polyurethane finishExternal colour and finish retention
ALKA 413 high-build epoxyIntermediate barrier protection
ALKA 404 zinc-rich epoxy primerCorrosion protection on prepared steel
Prepared carbon steelClean, profiled substrate and treated details

Schematic, not to scale. Follow the selected system for products, layer count and thickness.

TECHNICAL QUESTIONS

Details that affect system selection.

What information matters most for reagent areas?

Provide the exact chemical and concentration, operating and cleaning temperatures, contact duration and spill response. Include mixtures and occasional upset conditions rather than relying only on normal operation.

What belongs in the final technical submission?

Include current TDS and SDS, substrate preparation, the product and thickness schedule, application conditions, inspection criteria and cure requirements. For chemical or immersed service, include written suitability for the actual exposure. Any required certification or durability commitment must be supported by the relevant evidence.

Application boundaries

High-temperature equipment, severe slurry erosion and pressure-vessel performance are outside a general atmospheric coating selection. Record those duties separately in the plant specification.

PRODUCTS & TECHNICAL DOCUMENTS

Go directly to the product information.

Open the relevant product page for its published information and available documents. Request the current TDS and SDS set for the specified products before procurement.

MANUFACTURER TECHNICAL SUPPORT

Turn the service conditions into a coating specification.

Send the asset, substrate, exposure and maintenance window. ALKA can help define the coating build, preparation and technical documentation for your review.

Discuss your specification

Use current product data and the agreed project specification. Industry imagery is illustrative and does not represent a completed ALKA project.