Technical Guides

ALKA COATINGS / TECHNICAL RESOURCE CENTRE

Technical guides for coating decisions.

Nineteen practical guides for flooring, protective coatings, containment and waterproofing. Start with the substrate and service conditions, then verify the complete build against current ALKA technical information.

01 / AssessUnderstand the substrate, exposure and operating demands.
02 / CompareReview system choices and critical installation details.
03 / VerifyCheck current data, testing and project requirements.

Start with the substrate and finish

Preparation, moisture and material choices that shape a sound floor specification.

01 / SUBSTRATE

Prepare concrete for a resin floor

Assess contamination, moisture, repairs, surface profile and pre-coating hold points.

Read technical guide →
04 / MOISTURE

Assess moisture before resin flooring

Distinguish slab testing, damp-tolerant primers and documented moisture mitigation.

Read technical guide →
05 / MATERIALS

Compare epoxy, polyaspartic and PU cement

Choose a resin family by traffic, daylight, wet heat, shutdown and maintenance demands.

Read technical guide →
06 / FINISHES

Choose flake or solid-colour flooring

Compare appearance, texture, cleanability, repairs and the full coating build.

Read technical guide →
15 / CONCRETE

Resurface concrete or install a resin floor?

Assess soundness, outdoor exposure and use before selecting a decorative or bonded finish.

Read technical guide →

Match the floor to the facility

Focus on the traffic, liquids, temperatures and cleaning that the installed floor will see.

02 / FOOD FACILITIES

Specify a commercial kitchen floor

Turn washdown, heat, hygiene, drainage and cleaning into a workable system brief.

Read technical guide →
03 / WORKSHOPS

Choose a garage or workshop floor

Compare vehicle routes, point loads, spills, sunlight and decorative finish demands.

Read technical guide →
07 / WAREHOUSES

Plan a warehouse and forklift floor

Map hard-wheel traffic, turning, joints, markings and handover checks.

Read technical guide →
08 / ESD

Specify and test an ESD floor

Define the full floor–footwear system, grounding, acceptance tests and ongoing controls.

Read technical guide →
09 / CARPARKS

Assess carpark and ramp coatings

Separate vehicle traffic, pedestrian grip, drainage and weather exposure.

Read technical guide →

Protect steel, containment and buildings

Specify preparation, compatible layers, exposure and inspection for each asset.

10 / STEEL

Prepare structural steel for coating

Set cleaning, surface profile, edge details and measurable inspection criteria.

Read technical guide →
11 / PRIMERS

Compare zinc-rich and zinc-phosphate primers

Understand the different protection mechanisms and select a complete coating schedule.

Read technical guide →
12 / COATING SYSTEMS

Explain MIO epoxy and PU topcoats

Plan intermediate barrier and weathering layers around atmospheric exposure.

Read technical guide →
13 / CONTAINMENT

Select tank and bund linings

Define the chemical, concentration, temperature and immersion duty before naming a lining.

Read technical guide →
14 / WATERPROOFING

Choose a waterproofing membrane

Compare roofs, balconies and wet areas by assembly, detailing and intended finish.

Read technical guide →

Diagnose problems before repairing

Find the failure plane, investigate causes and select a repair that addresses the mechanism.

16 / ADHESION

Why resin floors delaminate

Separate concrete failure, primer loss and intercoat peeling before repair.

Read technical guide →
17 / DEFECTS

Blisters, bubbles and pinholes

Distinguish moisture pressure, outgassing and through-film discontinuities.

Read technical guide →
18 / MOVEMENT

Cracking and joint failure

Map cracks to substrate movement, details and film stress before bridging.

Read technical guide →
19 / WEAR

Discolouration and premature wear

Investigate UV, chemistry, cleaning, wheel traffic and film soundness.

Read technical guide →

Go from guidance to a specified build.

These guides support planning. Performance, compliance and installation limits must be confirmed against current ALKA TDS/SDS, project testing and site conditions.